In situ concrete roof slab 250mm

In situ concrete roof slab 250mm

Right 1

Click Here

Concrete 1

Pre cast concrete roof slabs 250mm thick

Right 2

Concrete 1a

Timber trussed rafter roof 35x97 members @ 600 crts

Right 3

Concrete 2

CLT roof deck 150mm thickness

Right 4

Timber 3

OSB roof deck 22mm

'Easijoists' 250mm depth @ 400mm ctrs

Right 5

Timber 4

OSB roof deck 22mm

'Easijoists' 250mm depth @ 400mm ctrs

Right 6

Timber 5

Trapezoidal metal roof deck

150x50 Z steel section purlins @ 1800mm ctrs

Right 7

Timber 5a

Trapezoidal metal roof deck

150x50 Z steel section purlins @ 1800mm ctrs

Right 8

Metal 6

Metal deck 250mm depth trapezoidal profile

Right 9

Metal 6a

OSB roof deck 22mm

Timber joists 50x200 @ 400 ctr

Right 10

Metal 7

Masonry vaults to form level deck

Right 11

Timber 8

Right 12

Masonary 9

In situ concrete columns
250x250mm
beams 450x250mm

In situ concrete columns
250x250mmbeams
400x800mm

Right 1

Concrete 1

Pre cast concrete columns
250x250 beams
450x250

Right 2

Concrete 1a

Timber frame walls 38x140 studs at 400mm ctrs
9mm OSB to outer face

Right 3

Concrete 2

CLT walls 100mm thickness

Right 4

Timber 3

Glulam columns 185x360mm
185x540mm beams

Right 5

Timber 4

Glulam columns 185x540mm @ 3m ctrs
185x1260mm beams @ 3m ctrs

Right 6

Timber 5

Rolled steel section columns 203x203UC 46kg/m
Steel beam 406x176 54kg/m

Right 7

Timber 5a

Rolled steel section columns 203x203UC 46kg/m
Steel beam 406x191 67kg/m

Right 8

Metal 6

Metal section stud walls c section 150x50mm @ 400 ctrs

9mm cementitious board to outer face

Right 9

Metal 6a

Masonry walls 150mm thickness

Right 10

Metal 7

Masonry vaults min 215 thickness at crown

Right 11

Timber 8

Right 12

Masonary 9

In situ concrete floor slab 250mm

concrete beams
250x350mm

Concrete columns 250x250mm

In situ concrete floor slab 250mm

concrete beams 850x400mm

Concrete columns 250x250mm

Right 1

Concrete 1

Pre cast concrete floor slabs 250mm thick

concrete beams 250x350

Concrete columns 250x250

Right 2

Concrete 1a

Timber joists 63x225mm @ 400 ctrs

22mm OSB floor

Timber frame walls 38x140mm studs at 400mm ctrs

Right 3

Concrete 2

CLT floor units 220 thickness

CLT walls 100mm thickness

Right 4

Timber 3

Timber joists 50x200mm

22mm OSB floor

glulam beams 185x540mm

glulam columns 185x360mm

Right 5

Timber 4

Timber joists 50x200mm

22mm OSB floor

glulam beams 185x1440mm @ 3m ctrs

glulam columns 185x540mm @ 3m ctrs

Right 6

Timber 5

In situ concrete slab 150mm on permanent metal shuttering

Steel beams 406x178ub 54akg/m @ 3m ctrs

Steel columns 203x203mm 46kg/m @ 6m ctrs

Right 7

Timber 5a

50mm screed on 100mm hollowcore precast concrete planks

Steel beams 610x229ub 101kg/m @ 3m ctrs

Steel columns 203x203mm 46kg/m @ 6m ctrs

Right 8

Metal 6

Metal floor joists 300x50 C section @400 ctrs

OSB floor 22mm

Metal section stud walls 150x50 C section @ 400 ctrs

9mm cementitious board to outer face

Right 9

Metal 6a

Timber joists 50x200mm @400 ctrs

22mm OSB floor

Masonry walls 150mm thickness

Right 10

Metal 7

Masonry columns 440x440mm

Masonry vaults min 215 thickness at crown
To form level floor deck

Right 11

Timber 8

Right 12

Masonary 9

In situ concrete ground bearing
slab 250 mm
Concrete bases 1000x1000x600 supporting edge columns
Concrete bases
2000 x 2000 x 1000 supporting centre columns

n situ concrete ground bearing slab 250 mm

Concrete bases 2200x2200x1000mm supporting edge columns

Right 1

Concrete 1

Pre cast concrete slabs 250 mm thick

Concrete bases 1000x1000x600 supporting edge columns

Concrete bases 2000 x 2000 x 1000 supporting centre columns

Right 2

Concrete 1a

In situ concrete slab 160mm

trench fill foundations 450x600mm at wall positions

Right 3

Concrete 2

Suspended in situ concrete slab 250mm

ground beams 600x600mm

concrete piles 300mm dia in pairs 15m long @ 6m ctrs

Right 4

Timber 3

Suspended in situ concrete slab 250mm

ground beams 600x600mm

concrete piles 300mm dia in pairs 15m long @ 6m ctrs

Right 5

Timber 4

Suspended in situ concrete slab 250mm

ground beams 600x600mm

concrete piles 300mm dia in pairs 15m long @ 6m ctrsh2

Right 6

Timber 5b

Suspended in situ concrete slab 250mm
ground beams 600x600mm
Concrete edge bases 1000x1000x600 supporting ground beams
Concrete centre bases 2000 x 2000 x 1000 supporting ground beams

Right 7

Timber 5a

Suspended in situ concrete slab 250mm

ground beams 600x600mm

Concrete bases 1000x1000x600 supporting ground beams

Right 8

Metal 6

Suspended in situ concrete slab 250mm

600x600 trench fill foundations

Right 9

Metal 6a

Timber joists 50x200mm @400 ctrs

22mm OSB floor

Masonry sleeper walls 150mm @ 3m ctrs

Concrete strip footings
600x300mm

Right 10

Metal 7

In situ concrete ground bearing slab 250 mm

Concrete bases 25000x25000x1250mm

Right 11

Timber 8

Right 12

Masonary 9

Structure (total):

 tCO2e

 kg CO2e/m2

Embodied Carbon Flipbook V7.62 ©Liverpool School of Architecture 2024, some portions of animation code licensed under MIT licence

Proportion of wall glazed Metal wall cladding and roof finish Concrete walls and roof deck Brick walls and concrete roof tiles Timber wall cladding and roof finish
100% 206 167 116 120
50% 213 171 118 123
30% 197 136 78 76
15% 194 111 43 35

Embodied carbon contained within the building envelope expressed as Kg of Carbon per Sq m of floor area

Notes
Notes
Notes